|
Новости

Practice and recent improvements of lead and
zinc production at KCM-S.A.
N. I. Dobrev, N.B. Mihailov, R. I. Tzonev, N.K.
Kolev
KCM – S.A., Assenovgradsko shosse, 4009 Plovdiv, Bulgaria
ABSTRACT
The present
company KCM-S.A. began its industrial activities in 1961 with the
start-up of the Zinc Plant. The Lead Plant began operation in 1963.
A number of technical improvements have been implemented during
the next years, aiming at increasing the capacity of the main operations
and introducing new ones.
Since 1990,
challenged by the necessity to solve as soon as possible the ecological
problems, KCM has been realizing gradually a program of technical
reconstruction. For a comparatively short period, the emissions
of dust and heavy metals with the waste process and ventilation
gases have been reduced under the stringent standards in Bulgaria
and the EC. The emissions of sulphur dioxide and industrial water
have been reduced many times.
During the same
period KCM began production of SHG zinc, a wide range of lead and
zinc alloys, silver, gold and products from precious metals and
their alloys.

Назад
|